
|
|
|
ESI Eurosilo® BV| Tel: | +31 (299) 630730 | | Fax: | +31 (299) 630737 | | E-mail: |
This e-mail address is being protected from spam bots, you need JavaScript enabled to view it
|
|
News
|
New contract for Tepco Hirono power plant |
|
In 1994 UBE, in cooperation with ESI Eurosilo, has installed the first FGD-Gypsum silo at the TEPCO Hirono Power plant. Due to the facts of: cost efficient storage, effective land utilisation, low maintenance cost and reliable operation, TEPCO has choosen to install a second Eurosilo at the Hirono power plant. More details can be found in the updated reference list. |
|
Prolongation of the ISO 9001:2008 certificate |
|
ESI Eurosilo has succesfully prolognated their ISO 9001:2008 cerfication! You can download a copy of the certificates in our Download section. |
|
New contract for the Korean Yeosu Power Plant |
|
KOSEP (Korean South East Power) has awarded ESI Eurosilo in cooperation with BAEKDOO a contract for the delivery of two 37,500 m3 coal storage silo for the YEOSU powerplant. |
|
 |
|
ESI Eurosilo maintains a Spare and Wear Parts Service with staff capable of catering to all of our customers’ needs. New standard parts are sourced from the original equipment manufactures and construction parts will be manufactured at our workshops according to the original workshop drawings or revised to the latest technical knowledge. In this way, we can ensure that the spare parts are identical and interchangeable with existing parts. Further advantages: Our spare parts are manufactured to the highest production standards. We can also provide substitute types for parts that are no longer available. We do all of this in a very timely manner and at very reasonable rates.
|
|
 |
|
HOW CAN WE HELP YOU? - Inspections
- Service contracts
- Preventative Maintenance
- Spare Parts supply
Contact us:
ESI Eurosilo BV After Sales Department Attn. R. Spaargaren Tel.: +31 299 630730 Fax: +31 299 630737 email: esi@eurosilo.com
|
 |
|

|

|
|
|

|