
|
|
|
ESI Eurosilo® BV| Tel: | +31 (299) 630730 | | Fax: | +31 (299) 630737 | | E-mail: |
This e-mail address is being protected from spam bots, you need JavaScript enabled to view it
|
|
News
|
New contract for Tepco Hirono power plant |
|
In 1994 UBE, in cooperation with ESI Eurosilo, has installed the first FGD-Gypsum silo at the TEPCO Hirono Power plant. Due to the facts of: cost efficient storage, effective land utilisation, low maintenance cost and reliable operation, TEPCO has choosen to install a second Eurosilo at the Hirono power plant. More details can be found in the updated reference list. |
|
Prolongation of the ISO 9001:2008 certificate |
|
ESI Eurosilo has succesfully prolognated their ISO 9001:2008 cerfication! You can download a copy of the certificates in our Download section. |
|
New contract for the Korean Yeosu Power Plant |
|
KOSEP (Korean South East Power) has awarded ESI Eurosilo in cooperation with BAEKDOO a contract for the delivery of two 37,500 m3 coal storage silo for the YEOSU powerplant. |
|
 |
|
Basic Chemicals and Minerals Industry |
|
|
|
|
To remove any irregularities within the logistical chain, basic chemicals must be stored in large quantities. However, these materials can be corrosive, hygroscopic, cohesive, and so on, and thus are potentially hazardous. Considering these environmental concerns – not to mention governmental regulations – these bulk materials must be stored in a properly responsible manner. The main applications for the Eurosilo in the basic chemicals and minerals industry include storage at the plant/mine site between production and train, truck or ship loading, storage at the plant site to store the basic product and storage at the port of user-owned terminal.
|
|
 |
|
|
 |
|

|

|
|
|

|